Measure first, then build.

Call us

Ouarzazate 30°55′N 6°54′W

Scroll

Method · From site to decision

  1. 01 Real terrain

    Site reconnaissance and tie-in to the project coordinate system.

  2. 02 Data

    Field acquisition: GNSS, total station, drone or laser scanner, depending on the assignment.

  3. 03 Measurement

    Computation, adjustment and accuracy checks on every measured point.

  4. 04 Digital model

    Terrain model, point cloud, topographic plans: the site becomes usable data.

  5. 05 Decision

    Deliverables that let you design, set out and inspect with confidence.

01Surveying and setting out

Terrain

Read the land before shaping it.

Lat. 30°55′N Long. 6°54′W Alt. 1,113 m

Hover over the map to read the elevation

5 km Real relief · Ouarzazate region · Contour interval 20 m · 1,002 to 1,565 m · SRTM

Every feature of the natural ground is measured, levelled and tied to the project coordinate system, for studies, design and construction.

Services
  • Topographic surveys and spot-height plans
  • Site plans and existing-condition surveys
  • Digital terrain models
  • Longitudinal profiles and cross-sections
  • Earthwork volume calculations
  • Setting out of structures and alignments
  • As-built surveys
  • Site monitoring and inspection
Deliverables
  • DWG and PDF drawings
  • DTM and contour lines
  • Point listings
  • Inspection reports
Equipment
  • Multi-frequency GNSS RTK
  • Total station
  • Level
Learn more: Topography and topographic surveys

02Drone and photogrammetry

Aerial survey

Hectares surveyed from the sky.

Survey area
9.8 ha
Flight lines
9
Photos
0
Control points
0 / 6

Illustrative flight plan · a real survey is designed around the required accuracy

GCP 1 GCP 2 GCP 3 GCP 4 GCP 5 GCP 6 N 0100 m

In a single flight, a drone covers areas that a ground crew would take several days to survey. Ground control points measured by GNSS anchor the images to produce georeferenced data.

Services
  • Flight planning and survey area
  • GNSS-measured ground control points
  • Georeferenced orthophoto map
  • Photogrammetric point cloud
  • Digital surface and terrain models
  • Volume and stockpile calculations
  • Construction progress monitoring
  • Mapping and GIS
Deliverables
  • GeoTIFF orthophoto
  • LAS/LAZ point cloud
  • DSM and DTM
  • Volume plans
Equipment
  • Photogrammetry drone
  • GNSS RTK
  • Photogrammetric processing
Learn more: Drone aerial surveys and photogrammetry

03Land and cadastre

Boundaries

Every boundary, marked on the ground.

Public road Neighbouring plot Neighbouring plot Neighbouring plot 29.40 m15.44 m12.93 m25.63 m15.46 m13.69 m B1 B2 B3 B4 B5 B6 N Boundary plan · Example Area 870 m² Markers 6
Coordinate table · example values
MarkerX (m)Y (m)
B1368,432.75422,168.75
B2368,462.00422,171.75
B3368,469.50422,158.25
B4368,465.75422,145.88
B5368,440.25422,143.25
B6368,430.50422,155.25

Tap a marker or a table row

Define, divide, regularise: land surveys fix the limits of a property. Corner points are measured, marked with boundary markers and recorded in the technical files.

Services
  • Boundary marking and marker reinstatement
  • Boundary delineation plans
  • Subdivision and plot division
  • Housing development technical files
  • Co-ownership technical files
  • Land registration files
  • Title updates
  • Partition plans
Deliverables
  • Boundary plan and report
  • Coordinate table
  • Technical files
Equipment
  • GNSS RTK
  • Total station
  • Markers and benchmarks
Learn more: Boundary surveys, land and cadastre

04Roads and utilities

Roads & utilities

The right level, all the way along.

Plan view

Centreline Sewer Drinking water

Longitudinal profile

11221124112611281130113211341136 0+0000+1000+2000+3000+4000+5000+600 p = -0.78 %p = -1.04 %p = -0.78 %
Ch. 0+240 NG — Design — Cut —
CutFill Illustrative drawing · 600 m of road · levels in metres

Roads, sewerage, drinking water, power, telecoms: every network depends on accurate gradients and levels. The ground is surveyed, profiles are drawn up and networks are set out before they are laid.

Services
  • Roads and utilities surveys and plans
  • Longitudinal profiles and cross-sections
  • Roads and earthworks
  • Sewerage and stormwater
  • Drinking water supply
  • Power and telecom networks
  • Setting out of networks
  • As-built surveys of laid networks
Deliverables
  • Roads and utilities plans
  • Longitudinal profiles and cross-sections
  • Setting-out records
  • As-built plans
Equipment
  • Total station
  • Level
  • GNSS RTK
Learn more: Roads and utilities (VRD)

053D scanning and digital models

3D scan

Buildings, captured point by point.

Points shown
0
Station
S1
Sweep
0°

Scroll: the scanner surveys the facade

A laser scanner records millions of points in a few minutes. The point cloud captures the structure exactly as built: a reliable basis for drawings, construction inspection and the digital model.

Services
  • Laser scanning
  • Registered point clouds
  • Architectural surveys: plans, elevations, sections
  • Digital model (scan-to-BIM)
  • Construction and compliance inspection
  • Site monitoring
  • Heritage documentation
Deliverables
  • E57 or LAS point cloud
  • Plans, elevations and sections
  • 3D model
Equipment
  • 3D laser scanner
  • Total station
  • GNSS RTK
Learn more: 3D scanning, point clouds and BIM

06Energy and major projects

Energy

At the scale of major works.

Substation Setting-out line Δ 4 mm Δ 7 mm Δ 3 mm Δ 9 mm Δ 5 mm Δ 2 mm Δ 6 mm Δ 8 mm Δ 3 mm Δ 5 mm Δ 4 mm Δ 7 mm N
Tables
273
Piles set out
110
Points checked
12
Illustrative plan of a solar plant · example values

Solar plants, earthworks, infrastructure: on large sites, surveying supports every phase, from the initial state of the ground to the inspection of completed works.

Services
  • Baseline site survey
  • Terrain model and earthwork volumes
  • Setting out of structures and piles
  • Geometric inspection of works
  • Earthworks monitoring
  • Coordination of ground and drone teams
Deliverables
  • DTM and volumes
  • Setting-out plans
  • Inspection reports
Equipment
  • GNSS RTK
  • Drone
  • Total station
Learn more: Energy and major projects

Projects

06 projects

Topographic Control of Solar Installations

Project 01 / 06

Topographic Control of Solar Installations

Discipline
Energy and major projects
Topographic Survey of Hydraulic Structures

Project 02 / 06

Topographic Survey of Hydraulic Structures

Discipline
Topography
Topographic Setting-Out of a Wind Farm

Project 03 / 06

Topographic Setting-Out of a Wind Farm

Discipline
Setting out and construction monitoring · Energy and major projects
Topographic Control of Road Works

Project 04 / 06

Topographic Control of Road Works

Discipline
Roads and utilities
Topographic Control of Sewer Networks

Project 05 / 06

Topographic Control of Sewer Networks

Discipline
Roads and utilities
3D Scanning and Topographic Control of Buildings Under Construction

Project 06 / 06

3D Scanning and Topographic Control of Buildings Under Construction

Discipline
3D scanning and BIM
The MAPTOPO team surveying the Noor Ouarzazate solar site

End · Noor Ouarzazate 31°00′N 6°52′W · Alt. 1,216 m

Let’s talk about your site.

Address N141 Lot Chems II Bis, Bergach, Ouarzazate

Quote request

Tell us about your project. We will come back to you with a proposal for the assignment.