Deformation · Settlement · Movement

Structural monitoring and deformation surveys

Regularly measuring what should stay still.

A dam, a bridge, a building next to an excavation or a high embankment can move by a few millimetres without anyone noticing. These movements must be measured to be understood and controlled.

Survey-based monitoring means measuring the same points at regular intervals, with a known accuracy, to track their movement over time and raise an alert before a threshold is exceeded.

All services

How is the movement of a structure measured?

Targets or markers are fixed to the structure, and stable reference points are installed outside the area likely to move. In each campaign, the targets are measured from these references.

Comparing campaigns gives the horizontal and vertical movement of each point. The accuracy of every measurement is calculated, which makes it possible to tell a real movement from a simple measurement error.

Results are presented as tables and trend charts, alongside the thresholds set by the engineering consultant or the asset manager.

Applications

  • 01

    Dams and embankments

    Monitoring movement of the crest, the face and ancillary structures.

  • 02

    Bridges and engineering structures

    Checking settlement of supports and deflection of decks.

  • 03

    Buildings next to works

    Monitoring facades during excavation or demolition.

  • 04

    Slopes and retaining structures

    Monitoring walls, embankments and cut slopes.

  • 05

    Foundations and slabs

    Measuring settlement during and after construction.

  • 06

    Solar and industrial structures

    Checking the geometry and stability of supports.

Methodology

  1. 01

    Monitoring design

    Choice of points to monitor, references and measurement frequency.

  2. 02

    Installation

    Fixing targets and markers, then an initial baseline measurement.

  3. 03

    Measurement campaigns

    Repeated measurements under the same conditions and with the same method.

  4. 04

    Computation and checks

    Adjustment, calculation of movements and their accuracy.

  5. 05

    Report and alerts

    Tables, trend charts and notification of exceeded thresholds.

Deliverables

  • Campaign reportHorizontal and vertical movement of each point.
  • Trend chartsHistory of movements since the baseline measurement.
  • Target location planPosition and identification of each monitored point.
  • Accuracy statementMethod, references used and accuracy achieved.

Technologies

  • Total stationMeasuring targets horizontally and vertically from stable points.
  • Precision levelMillimetre-level settlement monitoring by levelling.
  • GNSS RTKChecking reference points on extensive sites.
  • 3D laser scannerComparing complete surfaces between two campaigns.

Project types

  • Dams
  • Bridges
  • Buildings
  • Retaining walls
  • Slopes
  • Industrial sites

For the project owner

  • Anticipate rather than repair

    Movement detected early leaves time to act.

  • Comparable data

    Same method and same references in every campaign.

  • Full traceability

    Every measurement is dated, documented and verifiable.

Technical terms

Structural monitoring
Surveillance of a structure through measurements repeated over time.
Settlement
Vertical sinking of a structure or ground under load.
Reference point
A stable point, outside the moving area, from which measurements are taken.
Alert threshold
The movement value at which action is triggered.

Frequently asked questions

How often should measurements be taken?

It depends on the structure and the phase: frequently during high-risk works, less often in normal operation. The frequency is set with the engineering consultant or the asset manager.

What accuracy can be achieved?

Accuracy depends on the method, the distances and the site conditions. It is calculated and stated for each campaign, so you know whether a movement is significant.

Can you take over existing monitoring?

Yes, if the targets, references and previous measurements are available. The first campaign then checks consistency with the history.