Boundary marking · Subdivision · Housing developments · Co-ownership
Boundary surveys, land and cadastre
Every boundary measured and marked on the ground.
Land surveying work gives the boundaries of a property their legal and technical existence. It supports the registration, division, sale or regularisation of real estate.
In Morocco, this work falls within the profession of surveying engineer (ingénieur géomètre-topographe), governed by Law 30-93 and the National Order of Surveying Engineers (ONIGT), and results in technical files processed by the National Agency for Land Registration, Cadastre and Cartography (ANCFCC).
What is a boundary survey?
A boundary survey establishes the limits of a property and marks them with boundary markers placed at each corner. The corners are measured, their coordinates computed in the official system, and the operation is recorded in a report co-signed by the owner.
When a marker has disappeared, re-establishment consists of replacing it at its original position using the existing technical documents. In the event of a dispute between neighbours, the operation takes place in the presence of the parties concerned.
A boundary survey is often the preliminary step to other land operations: subdivision, housing development, co-ownership or title update, each leading to a technical file submitted to the cadastre.
Applications
- 01
Boundary marking and marker re-establishment
Marking or reconstructing boundaries, before building or fencing, or in case of encroachment.
- 02
Delimitation plan
Defining the boundaries of a plot for the land procedures that require it.
- 03
Subdivision
Separating part of a titled property to create a new land title.
- 04
Housing development
Boundary marking of the lots of an authorised development and preparation of files for the creation of titles.
- 05
Co-ownership
Dividing a building into private and common parts, with floor-by-floor plans and a schedule of areas.
- 06
Updates and partition
Bringing the title into line with the actual state of the land; partition plans for jointly owned property.
Methodology
- Step 01
File review
Analysis of the land title, plans and existing technical documents.
- Step 02
Survey and boundary marking
Measuring the corners, placing the markers and a report co-signed by the owner.
- Step 03
Technical file
Plans, reports and schedules of areas prepared to cadastre requirements.
- Step 04
Cadastre review
Review of the file by the cadastre services and any corrections.
- Step 05
Acceptance
Issue of the receipt allowing the owner to continue the procedure with the land registry.
Deliverables
- Boundary reportCo-signed by the owner and the surveyor.
- Boundary planBoundaries, markers and dimensions of the plot.
- Coordinate scheduleCoordinates of the markers in the official system.
- Schedule of areasAreas of the lots or private units.
- Technical fileDocuments required by the cadastre for the operation concerned.
Technologies
- GNSS RTKMeasuring corners and tying in to the official system.
- Total stationSurveying boundaries in built-up or obstructed areas.
- Coordinate systemsCoordinates expressed in the Moroccan Lambert system.
Project types
For the project owner
Indisputable boundaries
Markers placed and coordinates computed: the boundary can be recovered even if a marker disappears.
A procedure followed through to the cadastre
The technical file is prepared to the administration’s requirements.
A secure property
Sale, division or construction rest on regularised land.
Technical terms
- Land title (titre foncier)
- The document establishing the legal existence of a registered property and its real rights.
- Land registration (immatriculation)
- The procedure that enters a property in the land register and assigns it a title.
- Subdivision (morcellement)
- Dividing a titled property to separate part of it under a new title.
- Housing development (lotissement)
- Dividing land into building lots, governed by Law 25-90.
- Co-ownership (copropriété)
- A building divided into private and common parts, governed by Law 18-00.
- Title update (mise en concordance)
- Updating the title and plan so that they match the actual state of the land.
Frequently asked questions
When should a plot be surveyed and marked?
Before building or erecting a fence, before a sale, when encroachment is suspected, or as soon as a land operation (division, housing development, co-ownership) is being considered.
A boundary marker has disappeared: what should I do?
Marker re-establishment replaces it at its original position using the existing technical documents. A report records the operation.
What documents should be gathered?
Usually: the land title reference, an identity document or the owner’s commercial register extract and, depending on the operation, the corresponding authorisations and plans (development permit, building permit, architect’s drawings).
What is the difference between subdivision and a housing development?
Subdivision separates part of a property. A housing development divides land into building lots, after authorisation and installation of infrastructure, and leads to the creation of a title for each lot.