Solar power plants · Infrastructure · Earthworks
Energy and major projects
At the scale of major works.
Solar power plants, power lines, industrial platforms: major projects extend over dozens of hectares and involve many stakeholders. Surveying ensures geometric consistency at every phase.
From the initial survey to final inspection, ground measurements and drone surveys complement each other to keep pace with a fast-changing site.
The role of surveying in an energy project
Before design, a baseline survey describes the relief and constraints of the site. The resulting digital terrain model is used to optimise the layout of structures and to calculate earthwork volumes.
During construction, the positions of structures, piles, tracks and networks are set out from the project coordinates. On a solar power plant, this means thousands of points to be positioned consistently.
Geometric inspection then verifies that the completed works meet the tolerances, and successive surveys document the progress of the earthworks.
Applications
- 01
Site baseline survey
Topographic survey and terrain model before design.
- 02
Earthworks
Cut and fill calculations, monitoring of quantities executed.
- 03
Structure setting out
Positioning of tables, piles, foundations and substations.
- 04
Tracks and networks
Setting out and inspection of access roads and cable trenches.
- 05
Geometric inspection
Checking works against the project tolerances.
- 06
Drone monitoring
Successive orthophotos and models to track overall progress.
Methodology
- Step 01
Site control network
Reference points covering the entire site, a common base for all stakeholders.
- Step 02
Baseline survey
Ground and drone survey, DTM and earthwork volume calculations.
- Step 03
Setting out
Positioning of structures and networks in phases.
- Step 04
Inspection
Measuring completed works and deviation reports.
- Step 05
As-built survey
Plans of the works as built.
Deliverables
- DTM and contour linesThe basis for layout studies.
- Earthwork volume calculationsCut, fill and earthwork balances.
- Setting-out plansCoordinates of structures and piles.
- Inspection reportsMeasured deviations and compliance.
- Monitoring orthophotosGeoreferenced images at each stage.
Technologies
- GNSS RTKFast setting out over large, open sites.
- Photogrammetry droneBaseline survey and progress monitoring.
- Total stationPrecise inspection of structures.
Project types
For the project owner
A common reference frame
All stakeholders work in the same coordinate system.
Schedules maintained
GNSS and drones keep pace with large construction sites.
Verified compliance
Deviations are detected early, before they affect subsequent phases.
Technical terms
- Control network
- A network of reference points covering the site, the basis for all measurements.
- Earthwork volume calculation (cubature)
- Calculation of the volume of soil to be moved.
- Tolerance
- The maximum permitted deviation between the as-built position and the design position.
- Pile
- A foundation element driven into the ground to support structures.
Frequently asked questions
Why a common control network on a large site?
It ensures that all teams set out and inspect in the same reference frame, which avoids offsets between work packages.
Drone or ground survey for the baseline?
The drone quickly covers the site and produces the terrain model; ground measurements complement and check the areas that require higher accuracy.
How are earthworks monitored?
By comparing successive surveys of the ground: the difference between two models gives the volumes moved over the period.