Earthworks are often one of the heaviest cost items on a project. Accurately measuring the volumes to be moved, then those actually moved, protects the budget and simplifies payment for the works.
Earthwork volumes are calculated from digital terrain models derived from ground or drone surveys.
How are earthwork volumes calculated?
An earthwork volume calculation compares two surfaces: the natural ground and the design, or the ground at two different dates. Where the first is above the second, the result is a cut volume; where it is below, a fill volume.
The calculation is based on digital terrain models built from surveyed points, or on cross-sections spaced regularly along an alignment.
For stockpiles and quarries, the volume is calculated between the surface of the stockpile and its base. Repeated surveys track the quantities extracted or delivered over time.
Applications
- 01
Platform earthworks
Volumes to excavate and to bring in to reach design levels.
- 02
Roads and tracks
Earthwork volumes from cross-sections along the alignments.
- 03
Stockpiles and deposits
Volumes of materials stored on a site.
- 04
Quarries
Monitoring volumes extracted between two surveys.
- 05
Progress statements
Measured quantities executed for measurement records.
- 06
Cut/fill balances
Optimising earth movements on site.
Methodology
- Step 01
Initial survey
Model of the ground before works, by ground or drone survey.
- Step 02
Reference surface
Design, stockpile base or previous survey.
- Step 03
Calculation
Difference between surfaces, by grid or by profiles.
- Step 04
Check
Verification by an independent method on sensitive areas.
- Step 05
Report
Volumes, plans and difference maps.
Deliverables
- Calculation reportCut and fill volumes and balance.
- Difference mapsCut and fill areas visualised.
- ProfilesCross-sections where applicable.
Technologies
- Photogrammetry droneFast surface models over large sites.
- GNSS RTKGround surveys and check points.
- Total stationPrecise surveys of confined areas.
Project types
For the project owner
A controlled budget
Volumes calculated on the actual ground, not estimated.
Justified payments
Measured, traceable quantities.
Better organisation
A cut/fill balance that limits imported and exported material.
Technical terms
- Cut (déblai)
- Volume of soil removed where the ground is higher than the design.
- Fill (remblai)
- Volume of soil brought in where the ground is lower than the design.
- Bulking (foisonnement)
- The increase in volume of soil once excavated; it must be taken into account for haulage.
- DTM (MNT)
- Digital terrain model, the surface used for the calculation.
Frequently asked questions
Is a drone suitable for volume calculations?
Yes, especially for stockpiles and large platforms. The resulting surface model allows a complete calculation where a ground survey would be limited to profiles.
How can the volumes actually moved be determined?
By comparing a survey before works with a survey after works: the difference between the two models gives the quantities executed.