Setting out · Inspection · As-built survey

Setting out and construction monitoring

From plan to ground, in the right place and at the right level.

A well-designed structure can be badly built if it is wrongly positioned. Setting out transfers the project coordinates onto the ground; survey monitoring then checks that what is built matches what was designed.

MAPTOPO works for contractors who outsource their survey operations as well as for project owners who want to verify the geometry of the works.

What is setting out?

Setting out means physically marking on the ground, from project coordinates loaded into the instrument, the position of elements to be built: structural grid lines, building corners, alignments, kerbs, curve tangent points, reference elevation points.

It relies on approved drawings, on paper and in digital form, and on a control network of reference points established on site. Each setting-out operation is recorded in a signed report stating what was marked and when.

Construction monitoring extends the setting out: inspection of completed works, measurement of quantities executed and, at the end of the project, an as-built plan of the structure as constructed.

Applications

  • 01

    Building setting out

    Grid lines, corners, foundation levels and elevation benchmarks for the structural works.

  • 02

    Road and utility setting out

    Alignments, kerbs, manholes and invert levels positioned according to the roads and utilities design.

  • 03

    Construction inspection

    Checking the position and levels of structures against the construction drawings.

  • 04

    Quantity measurements

    Measuring lengths, areas and volumes executed to prepare and verify progress payment statements.

  • 05

    As-built plans

    Survey of the completed structure, the basis for handover and future management.

  • 06

    On-site survey support

    Regular presence of a surveyor to support the progress of the works.

Methodology

  1. Step 01

    Drawing review

    Review of the approved construction drawings and preparation of the coordinates to be set out.

  2. Step 02

    Site control network

    Establishing or checking the site reference points.

  3. Step 03

    Setting out

    Marking points on the ground with GNSS or a total station.

  4. Step 04

    Setting-out report

    Signed record of the elements set out, with a setting-out plan if requested.

  5. Step 05

    Inspection and as-built survey

    Checks at each key stage, immediate reporting of deviations, final as-built plan.

Deliverables

  • Setting-out reportSigned by the parties, with the list of points marked.
  • Setting-out planPosition of the points and benchmarks set out.
  • Inspection reportsDeviations measured against the design, after each visit.
  • Quantity measurementsLinear, area and volume quantities executed.
  • As-built planThe structure as built, in DWG and PDF.

Technologies

  • Total stationPrecise setting out and inspection of structures.
  • GNSS RTKFast setting out over large, open areas.
  • LevelChecking elevations, invert levels and gradients.

Project types

  • Buildings
  • Housing developments
  • Roads
  • Sewerage networks
  • Drinking water supply
  • Electrical networks
  • Bridges and structures
  • Solar power plants

For the project owner

  • Works that match the design

    Position and levels verified before it is too late to correct them.

  • Justified progress statements

    Quantities measured in the field, not estimated.

  • A documented handover

    The as-built plan records the existing structure for operation and future extensions.

Technical terms

Setting out (implantation)
Transferring onto the ground the position of structures defined on the drawings.
Benchmark
A marked point of known elevation, used as the reference for site levels.
Invert level
The elevation of the lowest internal point of a pipe, which governs flow.
As-built survey (récolement)
Survey of a structure after construction, to establish its actual position.
Measurement record (attachement)
A document recording the quantities of work actually executed.

Frequently asked questions

What documents are needed for setting out?

The approved construction drawings in digital and paper form, the works authorisation and, if possible, the schedule. Coordinates are always set out from validated drawings.

What happens if a deviation is found?

It is reported immediately to the contractor and the project owner, with its magnitude and location, so it can be corrected before subsequent works cover it.

Why produce an as-built plan?

It describes the structure as it was actually built. It is used for handover, for operating the networks and for any future project on the same site.