Roads · Sewerage · Water supply · Networks

Roads and utilities (VRD)

The right level, along the entire length.

Roads and utilities make land habitable: roads, sewerage, stormwater drainage, drinking water, electricity, telecommunications. Their proper functioning depends on correct gradients and levels.

Surveying is involved at every stage: existing conditions survey for design studies, profiles for design, setting out for construction and as-built survey for handover.

Expertise

Why is surveying central to roads and utilities?

A gravity sewer only works if its gradient is continuous and sufficient; a carriageway only drains water if its crossfalls are respected. These requirements are measured in centimetres over hundreds of metres.

Roads and utilities design relies on a survey of the natural ground and existing networks, followed by longitudinal profiles along the alignments and perpendicular cross-sections. These are used to fix the design line and derive cut and fill.

On site, alignments, kerbs, manholes and invert levels are set out from the design, then the installed networks are surveyed before backfilling to produce reliable as-built plans.

Applications

  • 01

    Roads and earthworks

    Existing conditions surveys, profiles, setting out of alignments and checking of formation levels.

  • 02

    Sewerage and stormwater

    Longitudinal profiles, invert levels, setting out of manholes and gradient checks.

  • 03

    Drinking water supply

    Routes, profiles and setting out of pipelines and structures.

  • 04

    Electricity and telecoms

    Surveys and setting out of routes, chambers and substations.

  • 05

    Housing developments and business parks

    Complete surveying of internal roads and utilities.

  • 06

    As-built network surveys

    Survey of installed networks before trenches are closed.

Methodology

  1. Step 01

    Existing conditions survey

    Natural ground, roads, structures and visible utilities (covers, manholes, hydrants).

  2. Step 02

    Profiles

    Longitudinal profiles along the alignments and cross-sections at regular intervals, provided to the designer.

  3. Step 03

    Setting out

    Alignments, kerbs, manholes and invert levels from the approved design.

  4. Step 04

    Inspection

    Checking gradients and levels during installation.

  5. Step 05

    As-built survey

    Survey of the completed networks and as-built plans.

Deliverables

  • Roads and utilities plansExisting conditions survey with visible utilities.
  • Longitudinal profiles and cross-sectionsNatural ground, design line, cut and fill.
  • Setting-out recordsCoordinates and elevations of the points set out.
  • As-built plansNetworks as installed, with invert levels and depths.

Technologies

  • Total stationSurvey and setting out of alignments and structures.
  • LevelChecking invert levels and gradients.
  • GNSS RTKSurvey and setting out in open areas.
  • DroneBase map and DTM for long routes.

Project types

  • Roads and tracks
  • Housing developments
  • Industrial zones
  • Sewerage
  • Drinking water
  • Electrical networks
  • Urban development

For the project owner

  • Networks that work

    Gradients and invert levels verified before trenches are closed.

  • Controlled quantities

    Cut and fill calculated on the actual ground.

  • Documented assets

    As-built plans make operation and future interventions easier.

Technical terms

Longitudinal profile
A section of the ground and the design along an alignment, with elevations and gradients.
Cross-section
A section perpendicular to the alignment showing the carriageway, slopes and verges.
Cut / fill
Soil to be removed where the ground is above the design, to be brought in where it is below.
Invert level
The elevation of the lowest internal point of a pipe.
Chainage (PK)
The distance of a point along the alignment, for example 0+250.
Water supply (AEP)
Drinking water supply.

Frequently asked questions

What is the difference between a longitudinal profile and a cross-section?

A longitudinal profile follows the project alignment and shows how its elevation changes. A cross-section cuts the alignment at a given point and shows the shape of the carriageway or trench.

Why survey networks before backfilling?

Once the trench is closed, the position and depth of a network can no longer be checked without excavation. Surveying before backfilling guarantees accurate as-built plans.

Does a roads and utilities survey include buried networks?

A topographic survey records visible elements (manholes, covers, hydrants, poles). The position of buried networks comes from utility operators’ plans or additional trial pits.