Housing developments · Subdivision · Development plans
Urban planning and land development
Development projects built on measured ground.
A housing development, a public facility or the extension of a neighbourhood all start with a simple question: what does the land look like today, and what do the rules that apply to it allow?
MAPTOPO provides architects, urban planners, developers and local authorities with the plans and data that underpin planning files, then sets out on the ground what has been approved.
What is the surveyor’s role in a development project?
A development plan is drawn on a topographic base map. If the boundaries, elevations or existing buildings on it are wrong, the lot areas, road gradients and earthwork volumes will be wrong too.
The surveyor produces this base map: property boundaries, relief, buildings, trees, roads and visible utilities, all tied to the official coordinate system. They then prepare the technical documents for housing development or subdivision files.
Once the project is approved, they set out the lots, roads and structures, then check that the completed works comply before handover.
Applications
- 01
Housing developments
Existing conditions plan, development plan, lot layout and placement of boundary markers.
- 02
Subdivision
Division of a property into several plots, with plans and schedules of areas.
- 03
Public facilities
Site surveys for schools, health centres, green spaces and administrative buildings.
- 04
Neighbourhood renewal
Survey of existing buildings and roads for regeneration studies.
- 05
Business parks
Topographic plans, internal roads and layout of industrial lots.
- 06
Compliance checks
On-site verification of the set-out positions and completed areas.
Methodology
- 01
Data collection
Land titles, existing plans, planning regulations and the project owner’s requirements.
- 02
Existing conditions survey
Boundaries, relief, buildings, roads and visible utilities, tied to the official system.
- 03
Design support
Base map, profiles and areas provided to the architect or urban planner.
- 04
Technical files
Housing development or subdivision plans, schedules of areas and coordinates.
- 05
Setting out and inspection
Marking out lots and roads on the ground, then checking the works.
Deliverables
- Existing conditions planDimensioned topographic base map, in DWG and PDF.
- Housing development or subdivision planLot layout, roads and common areas.
- Schedules of areas and coordinatesArea of each lot and coordinates of its corners.
- Setting-out recordsBoundary markers placed and points set out on the ground.
Technologies
- GNSS RTKTie-in to the official coordinate system and survey of large sites.
- Total stationDetailed survey of buildings and accurate setting out of lots.
- DroneOrthophoto and terrain model for extensive sites.
- CAD and GIS softwarePlan production and data organisation.
Project types
For the project owner
Accurate areas
The areas sold or transferred match the actual land.
Complete files
Technical documents are ready for administrative review.
Fewer surprises on site
Relief and existing features are known before works begin.
Technical terms
- Existing conditions plan
- A representation of the land and everything on it before the project.
- Housing development (lotissement)
- Division of a property into building lots, with roads and utilities.
- Subdivision (morcellement)
- Division of a property into plots, without creating roads or utilities.
- Floor area ratio
- The ratio between buildable floor area and plot area, set by the planning regulations.
Frequently asked questions
What is the difference between a housing development and a subdivision?
A housing development creates building lots with roads and utilities to be built. A subdivision divides a property into plots without any servicing works. Both require plans drawn up from a topographic survey.
When should the surveyor be brought in?
From the start: the existing conditions plan is the basis for the architect or urban planner’s work. Bringing the surveyor in early avoids designing on an approximate base map.
Is the survey tied to the official coordinate system?
Yes. Surveys are tied to the coordinate system in force, so they can be used in administrative files and overlaid on existing plans.